A Consideration of Precedence Relationships as Decision Variables in Construction Scheduling Model

Resource-constrained construction scheduling problem (RCSP) is aimed to determine the optimum project resource utilization. The solving process is to shift the start time of activities within their own floating times. The feasible solutions are restricted to maintain all predefined precedence relationships. These relationships are arbitrarily defined by planners themselves and some can be revised according to managerial policies. This research initiates anew RCSP with a capability of reviewing precedence relationships. The new model provides the options of the relationships as decision variables. Therefore, the feasible solution space is expanded and this increases the chance of getting better solutions. The model is developed using Microsoft Excel and Genetic Algorithms (GA) is used for the optimization. The model is also tested with a reference case study. The result shows that the model can improve solutions which give smoother resource utilization profiles and lower resources required. This model can help planners choose suitable relationship options.

resource-constrained construction scheduling resource allocation resource leveling activity relationships.

Vacharapoom BENJAORAN

School of Civil Engineering, Suranaree University of Technology, Nakhonratchasima, Thailand 30000

国际会议

2011 International Conference on Construction & Real Estate Management(2011建设与房地产管理国际会议)

广州

英文

84-87

2011-11-19(万方平台首次上网日期,不代表论文的发表时间)