Severity of Time Overrun Causes in Road Construction Projects: Contractors’ Perspective

A survey on time performance of road construction projects in the West Bank-Palestine was conducted to determine the causes of time overrun and their severity according to contractors. The field survey conducted included 34 contractors. 52 causes of time overrun were identified during the research. The survey concluded that the top five severe time overrun causes are: segmentation of the West Bank and limited movement between areas, political situation, progress payments delay by owner, delay in decision making by owner, and low productivity of labors.

time overrun delay severity index road construction construction management

Ibrahim MAHAMID Amund BRULAND

Department of Civil and Transport Engineering,Norwegian University of Science and Technology (NTNU), Civil and Transport Eng. Dept., Norwegian University of Science and Technology, Trondheim, Norway

国际会议

2011 International Conference on Construction & Real Estate Management(2011建设与房地产管理国际会议)

广州

英文

191-194

2011-11-19(万方平台首次上网日期,不代表论文的发表时间)