会议专题

Discussion of Quality Management of Large Complex Equipment under the Cross State of Development and Production

The development of large complex equipment takes very long and needs to reduce the time introduced to the market. The cross state of development and production appears frequently because of the tight schedule. The cross may result in instability problems of quality and would delay development schedule ultimately. In order to ensure the quality and schedule, the method and strategy used for the cross state of development and production are discussed in this paper. The main problems caused by the cross situation are analyzed. And then the solution is proposed to the question, that is the management process needs to be infused with more in-depth systems analysis during the early stages and planned using tenets of process control, configuration management and integrated test & evaluation methods. These approaches may accelerate the exposure of technical problems as far to the left as possible. Therefore such management process could help to ensure the quality consistency and schedule under the cross state of development and production.

Quality Management Cross State Process Control Configuration Management Integrated Test and Evaluation

Xue Cheng Zhang Jia Chen Wang Xu Ning Sun Yong Jie Wang

Military Representative Office in Shanghai Region, Shanghai, China

国际会议

2011 International Conference on Mechatronics and Materials Processing(2011年机电一体化与材料加工国际会议 ICMMP)

广州

英文

2390-2393

2011-11-18(万方平台首次上网日期,不代表论文的发表时间)