Calculation of Hongdu Bridge Foundation Construction
Hongdu Bridge is an extraordinarily huge bride across northern branch Ganjiang River, in the city of Nanchang. Main tower adopted single column slanted pylon space twist face back cable structure. Its construction is based on double-wall cofferdam method. The paper discuss thecalculation of key step and key position for the key technology in terms of double-wall cofferdam and platform underwater construction, Which include the design of the base construction and double-wall cofferdam,steel cofferdam construction, the calculation and checking of the cofferdam and so on. The whole length of 9.5 km, except the starting period of about 2.4 km for roadbed type, the other sections of approximately 7 km. The project always invests about 18 Billion yuan.
Hongdu Bhdge foundation Construction Technique Calculation
Jinbo Song
Jiangxi Vocational and Technical College of Communication, Nanchang, China
国际会议
上海
英文
1264-1267
2011-10-21(万方平台首次上网日期,不代表论文的发表时间)