会议专题

The Major Problems and Countermeasures on the Shield Machine Tunneling in the Hard Rock Stratum

Abstract. With the rapid development of urban construction, the shield construction technology has been greatly developed. Shield tunneling method generally adapts to relatively uniform soil, soft rock and sand rock strata, and the shield tunnel construction has been more mature for the homogeneous strata. However, for the soft and hard interbedded strata, how to solve the problems of breaking the hard rock, increasing the tunneling efficiency and reducing the construction costs, are difficult problems in the shield tunnel construction. In this paper, based on a great deal of theoretical analyses and engineering practices, the effective methods of improving the efficiency of tunneling, reducing cutter wearing and decreasing the construction costs in the process of the shield tunneling construction in hard rock and gravel layer are proposed.

Shield machine Construction Hard rock Gravel layer Cutterhead Cutter Design

Kai Rong Hong Ren Hua Yang

State Key Laboratory of Shield Machine and Boring Technology, China Railway Tunnel Group Co.,Ltd., Z Department of Civil Engineering,Luoyang Institute of Science and Technology,Luoyang 471023,China

国际会议

2011 International Conference on Vibration,Structural Engineering and Measurement(2011年振动、结构工程与测量国际会议 ICVSEM 2011)

上海

英文

1438-1442

2011-10-21(万方平台首次上网日期,不代表论文的发表时间)