会议专题

Study on Seismic Permanent Deformation of Earth Rock Fill Dam

For the flaw of safety evaluation system using safety factor as control index, seismic permanent deformation is used to evaluate the safety of earth rock fill dam. In this study, the seismic deformation of Zipingpu dam after Wenchuan earthquake is measured and analysis. The deformation in the middle of the riverbed on the crest is the largest. The deformation in the left dam abutment is smaller than that in the right. The seismic permanent deformation on the crest grows rapidly in the first three days, and then develops slowly. The results show that deformation grows along the height of dam with the relation of exponential or power function.

Permanent deformation Numerical simulation Zipingpu dam Safety evaluation system Earth rock fill dam CFRD

Guobin Zhou Jianming Zhao Yanfeng Wen Zhengquan Yang

Department of Geotechnical Engineering, IWHR,No. 20, West Chegongzhuang Road,Haidian District, Beijing, P.R. China 100044

国际会议

2011 International Conference on Vibration,Structural Engineering and Measurement(2011年振动、结构工程与测量国际会议 ICVSEM 2011)

上海

英文

1452-1455

2011-10-21(万方平台首次上网日期,不代表论文的发表时间)