Research on Measure-control Technology of Large-span Suspendome during Construction Period

In order to ensure the prestress establishment of large-span suspendome, research on the measurecontrol methods for large-span suspendome during prestress construction process is performed, by summarizing the existing measure and test methods. According to engineering practice at present, the paper classifies the measure-control content of large-span suspendome during prestress construction period into two parts: internal force of cable-strut and deformation of steel structure. Taking practical project of a gymnasium as an example, the axial forces of hoop cables, radial steel tie rods and struts are measured, and also the verticality of struts. The test results are analyzed, and compared with the calculated value. The results show that, the internal forces of cable-strut and verticality of struts can both meet the design requirement, by mechanical analyzing and precise monitoring of the whole prestress construction process. The conclusion is that, before the prestress construction of largespan suspendome, construction mechanics analysis must be carried out in details to determine the control content and its target value, right measure-control methods are chosen, and then the effective establishment of prestress can be achieved.

Suspendome Prestress construction Measure-control technology Construction mechanics

Yongquan WANG Zhengxing GUO Bin LUO

College of Water Conservancy and Hydropower Engineering, Hohai University,Nanjing,China College of Civil Engineering, Southeast University, Nanjing,China

国际会议

2011 International Conference on Vibration,Structural Engineering and Measurement(2011年振动、结构工程与测量国际会议 ICVSEM 2011)

上海

英文

2010-2014

2011-10-21(万方平台首次上网日期,不代表论文的发表时间)