Optimal Preventive Maintenance Intervals of a Rolling Stock System
In this paper, we deal with a preventive maintenance (PM) scheduling problem for a rolling stock system. We want to determine the interval of PM for components in rolling stock system. The total expected cost for system life cycle and system availability are used as optimization criteria. We consider two types of PM (short-term and long-term PM). For given PM intervals, we estimate availability and life cycle cost by simulation (a commercial simulation program, AvSim). Numerical examples are also studied to investigate the effect of model parameters on the optimal solution.
preventive maintenance interval rolling stock system life cycle cost
Goeun PARK Won Young YUN Young-Jin HAN Jong-Woon KIM
Department of Industrial Engineering Pusan National University Busan, Korea Railroad Environment Research Department Korea Railroad Research Institute Uiwang, Gyeonggi-do, Kore
国际会议
西安
英文
440-443
2011-06-17(万方平台首次上网日期,不代表论文的发表时间)