Model on Evaluating Operational Readiness of Equipment Group for Depot-Level Maintenance
The force of depot-level maintenance is essential to improve equipment operational readiness rapidly. And through analysis the structure of depot-level maintenance and the working requirements, consider spare fill rate ,replacement of repair time and supply time influence for operational readiness, and puts forward the proper evaluating model . Through an example to illustrate the validity of the evaluating model and the various factors influence extent of operational readiness.
operational readiness spare fill rate equipment group depot-level
Tao LI Ying XU Xian-Wen WANG
Department of Equipment Command and Management, Mechanical Engineering College Shijiazhuang, China Department of Equipment Command and Management,Mechanical Engineering College Shijiazhuang, China Teaching and Research Section of Equipment technology Artillery Command Academy Xuanhua, China
国际会议
西安
英文
809-812
2011-06-17(万方平台首次上网日期,不代表论文的发表时间)