Decreasing the Software Project Failures by Using Accurate Estimations
Project planning is one of the most important activities in software projects. Poor planning often leads to project faults and dramatic outcomes for the project team. If cost and effort are determined pessimistic in software projects, suitable occasions can be missed; whereas optimistic predictions can be caused to some resource losing. Nowadays software project managers should be aware of the increasing of project failures. The main reason for this problem is imprecision of the estimation. In this paper, several existing methods for software cost estimation are illustrated and their aspects will be discussed clearly. Comparing the features of the methods could be applied for clustering based on abilities; it is also useful for selecting the special method for each project The history of using each estimation model leads to have a good choice for an especial software project. In this paper an example of estimation is also presented in an actual software project.
Cost Estimation Indicator Cocomo Accuracy
Vahid Khatibi Dayang Norhayati Abang Jawawi
Department of Software Engineering Universiti Teknologi Malaysia(UTM) Johor,Malaysia Department of Software Engineering Universiti Teknologi Malaysia(UTM) Johor.Malaysia
国际会议
重庆
英文
38-44
2011-01-21(万方平台首次上网日期,不代表论文的发表时间)