会议专题

The Research of Breakdown Structure and Coding System for Construction Project

Whether the breakdown structure and coding system of construction project is reasonable or not decides the performance level of the entire project management to a large degree. We analyze the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements in detail based on the discussion of international typical coding standards system designing and then we deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic illumination of the implementation of the systems functions..

Construction Project Breakdown structure Comprehensive breakdown system

DING Dayong JIN Weixing LI Pei

Doctoral candidate. Research Institute of Construction & Economy, Xian University of Architecture & Research Institute of Construction & Economy,Xian University of Architecture & Technology. Xian, S

国际会议

2003 International Conference on Construction & Real Estate Management(2003 建设与房地产管理国际会议)

哈尔滨

英文

24-27

2003-11-20(万方平台首次上网日期,不代表论文的发表时间)