会议专题

Research on integration of roadway excavation, bolting, support, and detection

According to the situation that temporary support equipment is backward, new type temporary support equipment is developed. This temporary support equipment can support roof and front wall of roadway quickly, can reduce roof subsidence, roof fall accidents, front wall collapse, and labor intensity, and has high economic and wide application value. Integration ideas of roadway excavation, bolting, support, and detection is put forward, i.e. to make roadheader as a platform and combine new type temporary support equipment, new type bolter, and detection devices with roadheader to achieve reasonable dynamic roof support design and safe rapid roadway excavation.

new type temporary support equipment integration roadheader detection equipment safety and high efficiency

Chen Jia-sheng Gao Ming-zhong

School of Mechanical Engineering, Anhui University of Science and Technology, Huainan City 232001, C School of Energy and Safety, Anhui University of Science and Technology, Huainan City 232001, China

国际会议

The First International Symposium on Mine Safety Science and Engineering (首届矿山安全科学与工程学术会议)

北京

英文

907-913

2011-10-27(万方平台首次上网日期,不代表论文的发表时间)