A MODEL AND ALGORITHM FOR THE YARD CRANE SCHEDULING PROBLEM UNDER STOCHASTIC ENVIRONMENT
This paper aims at advancing a heuristic algorithm for the yard crane deploying problem under stochastic environment. In this study, a dynamic integer programming for the problem is initially developed. Taking account of the stochastic and complex characteristic of this model, it is then converted into an equivalent expression, and a heuristic algorithm is supposed to solve this model. Finally, some numerical experiments are taken to illustrate the efficiency of this algorithm, and a plan of yard crane scheduling is also shown for instance.
Yard crane Deploying Integer programming Dynamic programming Heuristic algorithm
ZHICHENG BIAN DAOFANG CHANG WEIJIAN MI
SMU LOGISTICS RESEARCH CENTER,SHANGHAI MARITIME UNIVERSITY,SHANGHAI 200135, PR CHINA SCHOOL OF MECHANICAL ENGINEERING,SHANGHAI JIAO TONG UNIVERSITY,SHANGHAI 200240, PR CHINA SCHOOL OF LOGISTICS ENGINEERING,SHANGHAI MARITIME UNIVERSITY,SHANGHAI 200135, PR CHINA
国际会议
3rd International Conference on Mechanical and Electrical Technology(ICMET2011) (2011第三届机械与电气技术国际会议)
大连
英文
603-612
2011-08-26(万方平台首次上网日期,不代表论文的发表时间)