Study on Engineering Cost Forecasting of Electric Power Construction Based on Time Response Function Optimization Grey Model
This paper discussed an improved gray forecasting model for electric power construction project engineering cost forecasting. A method of time response function optimization is proposed, namely using constraint condition of minimum Euclidean distance of original sequence and simulation value to determine the constant C, build time response function optimization grey forecasting model, and then make better use of the original message. Apply the improved model to forecast the main engineering cost index of electric power construction. Compare this grey forecasting method with regression forecasting method, the results show that improved model has higher prediction accuracy and the effect of actual application is better than before.
electric power construction project engineering cost gray model time response function
Li Wei Yuan Ya-nan Dong Wei-dong Zhang Bo
Department of Economics and Management North China Electric Power University Baoding, Hebei, 071003, China
国际会议
西安
英文
58-61
2011-05-13(万方平台首次上网日期,不代表论文的发表时间)