会议专题

Fuzzy optimization of water resources project scheme based on improved grey relation analysis

Aiming at the fuzzy and correlation among technical evaluation indexes in the water resources project design scheme, the paper studied the decision-making problem of system design scheme.Based on the preferred subjection degree and grey incidence, the method of improving grey incidence fuzzy decision-making was proposed. It aimed to seek the optimal design scheme of complex systems from the whole perspectives. Original datas were nondimensionalized and normalized by using fuzzy math subjection function theory. The technical index weight set and grey incidence coefficient matrix were built to avoid the information loss of technical indexes in the evaluation process.The fuzzy optimization of water resources project design scheme was implemented through a comprehensive evaluation model.Finally,a water resources project was taken as an example.! he verified model can effectively reduce subjective disturbance in the evaluation process and make the decision of design scheme more comprehensive and objective.

decision making optimization information cluster grey incidence degrees resolution coefficient

Guang-hui WEI FENG LIU LIANG MA

School of Water Resources & Civil Engineering Xinjiang Agricultural University Urumqi City,Xinjiang Province,China

国际会议

2011 3rd IEEE International Conference on Computer Research and Development(ICCRD 2011)(2011第三届计算机研究与发展国际会议)

上海

英文

333-336

2011-03-11(万方平台首次上网日期,不代表论文的发表时间)