V-shape Property for the Quadratic JIT Schedules with Random Processing Times

This article addresses the problem of scheduling n jobs with random processing times on a machine so as to minimize the expected sum of squared deviations (ESSD) of job completion times from a common due date.We mainly concern the V-shape property of optimal solutions.Through a large and deep stochastic analysis,we obtain the following results and conclusions.A sufficient condition for an optimal sequence to be V-shaped is proposed and proved.The well known equivalence relation between the deterministic unconstrained sum of squared deviations (SSD) problem and the deterministic completion times variance (S-CTV) problem is extended to the situation with the processing times to be independent random variables.In addition,we also show the optimal solution of ESSD problem may not possess V-shape property by a counterexample.

stochastic scheduling common due date quadratic earliness-tardiness penalties V-shape property

Congdian Cheng Chunfu Jia

College of Mathematics and Systems Science Shenyang Normal University Shenyang,110034,Peoples Repub Department of Computer and System Sciences Nankai University Tianjin,300071,Peoples Republic of Chi

国际会议

2011 3rd International Conference on Computer and Network Technology(ICCNT 2011)(2011第三届IEEE计算机与网络技术国际会议)

太原

英文

437-441

2011-02-26(万方平台首次上网日期,不代表论文的发表时间)