会议专题

Dynamic Preventive Maintenance,Optimization of Time Between Overhaul

We present in this paper an method for evaluating the reliabilitv in real time applied to the optimization of preventive maintenance and evaluation of the parameters of dependability.This approach is based on a function Z (t), which assesses the damage from the history of real operating conditions.This assessment is used to calculate the residual reliabilitv.and can then be used to optimize the preventive maintenance and In particular optimize the time between overhaul(TBO).This approach call be used to take more realistic decisions about preventive change and thus led to a better risk management.

Dynamic Preventive Maintenance-Cox model-weibulllaw-damate Reliabilio

LYONNET Patrick TOSCANO Rosario

ENISE,UMR 5513,LTDS,58,rue J.Parot 42000 St.ETIENNE-France

国际会议

2011 International Conference on Manufacturing and Industrial Engineering(ICMIE 2011)(2011年制造及工业工程国际会议)

海口

英文

151-154

2011-02-22(万方平台首次上网日期,不代表论文的发表时间)