会议专题

Design and Implementation of an Integrated System of Mining GIS and AutoCAD

To improve mine production efficiency, a GIS integrated system based on AutoCAD was developed for mine based on software engineering principles. The developing process included requirement analysis, structural design, database design, functional design, system implementation and functional verification. The system has basic information management, image-text interactive queries of coal and slope GIS, automatic drawing, attribute analysis and calculation function, etc. Lastly, the system was applied in a mine in China, which can achieve perfect connection to the current AutoCAD platform, improve mine production design and provide data query, information analysis and technical decision support for mine.

AutoCAD GIS Integrated System Mine

Li Cuiping Sun Zhenming Li Zhongxue Zhang Lei

Department of Mineral Resources Engineering, University of Science and Technology Beijing The Key Laboratory of High Efficiency Mining and Safety for Metal Mines, Ministry of Education Beijing, China

国际会议

2011 IEEE International Conference on Information and Education Technology(ICIET 2011)(2011年信息和教育技术国际会议)

贵阳

英文

67-70

2011-01-26(万方平台首次上网日期,不代表论文的发表时间)