A Contractor Prequalification Model based on Triangular Fuzzy Number and TOPSIS

Contractor prequalification is the process of choosing the competent contractor to bidding, during this process, the construction owner should to evaluate many aspects of contractors’ abilities, such as financial standing, technical ability, experience and credibility. All these criteria both have quantitative and qualitative criteria, the qualitative criteria often difficult to be quantified, and it is a difficult task to determine one common scale of appraisal for all the criteria. So in this paper the author use the linguistics variables to evaluate the criteria that the given contractors satisfying and the importance weight of the criteria, then translate the linguistics variables into triangular fuzzy numbers, and using the TOPSIS method to calculate the fuzzy positive ideal solution and fuzzy negative ideal solution and the relative closeness to the ideal solution by every contractor, finally the most competent contractor is found.

Zhen WEI Xue-qing WANG Qing-e GUO

College of Management and Economics, Tianjin University, Tianjin, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1-4

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)