Research on EPCM Project Procurement Risk based on TOPSIS and RBF Method

Procurement is a core link under the EPCM model. Identifying and analyzing procurement risk is of significance to make sensible procurement decision. This paper analyzes the procurement risk under the EPCM model at first. According to the above, the writer proposed a procurement risk assessment model based on TOPSIS and RBF method, and connected with the engineering examples, made empirical analysis based on a certain amount of project procurement statistics data. The whole research shows that the new method leads to a more efficient and exact assessment for the procurement risk under the EPCM model, and meanwhile, it could provide strong support structure for the implementation of integrated procurement risk management and the establishment of financial risk early warning mechanism.

Xing BI Liang XIE Cui MAO

School of Management and Economics, Tianjin University, Tianjin, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

177-180

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)