Research on Life Cycle Cost of Military Connected-container and Connector
The life cycle cost of military connected container and connector is estimated and calculated through analyzing the construction of its breakdown structure. It is validated that the military connected-container and connector designed rationally.
Min ZHONG Qin-zhen LI Rui WANG Ji-xia CAO
General Courses Department, Academy of Military Transportation, Tianjin 300161, China Automobile Transport Command Department, Academy of Military Transportation, Tianjin 300161,China
国际会议
长春
英文
416-419
2011-09-03(万方平台首次上网日期,不代表论文的发表时间)