Value Engineering Applied at the Construction Planning Stage

Based on the life cycle of architecture this research is designed to study the construction of a superheight building. It serves as an example and discusses the effects of Value Engineering when applied in the planning stage after systematic evaluation, including the creative model, cost analysis, matrix evaluation and major factors analysis. A pre-cast external wall was used in high-level architecture to replace the complex external wall system. It turned out that the cost of external walls was reduced by 43%, which was equal to 4.1% of the total construction cost, or about NTD forty-three million Yuan. Therefore, VE when applied to the planning stage of construction was extremely effective, and the overall cost reduction showed VE to be worthy application for architecture designers and construction manager.

T.T.Chen T.I.Kuo C.S.Lin

Department of Civil Engineering and Engineering Management, National Quemoy University, Taiwan, R.O. Department of Business Administration, National Quemoy University, Taiwan, R.O.C

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

443-447

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)