会议专题

Method Study of Calculating and Controlling Work-In-Process

The focus of this paper is to study two methods of calculating the work-in-process as applied to manufacturing system. A teamwork chart is given to figure out the composing and related quantity of work-in-process when we focus on comparatively simple process or parts of a complex process. But when we focus on more complex production process, an I-O curve is introduced instead of teamwork for more easily studying the quantity of work-in- process. Moreover, the paper discusses the main factors which affect the quantity of the work-in-process and illustrates how to better control and monitor them.

Xiao-yan SONG Lang WU

Department of Industrial Engineering, GAA (H.K) Ltd, Dong Guan, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

717-720

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)