会议专题

The Planning Optimization for Maintenance and Repairment of Railway-cars in Jinan Railway Bureau

This paper first analyzes a few problems deeply and thoroughly.According to the requirement for the car maintenance and repairment in the cause of the transport production in Jinan Railway Bureau, a transport programming is given out for the whole location of the car maintenance and repairment in Jinan West Car-depot with an analysis to the quantity of the car maintenance and repairment task. At the same time, we demonstrate how to set a correct decision-making in the face of new situations and new challenges, and how to optimize the productionorganization and how to make a concrete reconstruction scheme in accordance with the railway development as a whole.

Xiao-fei MA Guang CHENG

Department of Industrial Engineering and Logistics, College of Mechanical and Electrical Engineering, Beijing Union University, Beijing, P.R.China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

865-868

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)