会议专题

Research On Assembly Line Balancing Based On Labor Proficiency

Difference of assembly time, which dues to varied labor proficiency, has impact on efficiency of assembly line balancing. Two different working teams may even result in imbalance of assembly line. On account of this problem, this paper took axle assembly line of an axle assembly plant for example, conducted proficiency tests of the two working teams and calculated the assembly time of each worker on every stationon the basis of regular assembly line balancing, followed by overall optimization using genetic algorithm which makes productivity of the two working teams more balanced, so as to can achieve the optimization of assembly lines.

Ting LI Deng DENG Ming-wei ZHANG

School of Management, Renai College of Tianjin University, Tianjin, 300072, P.R.China School of Economics, Nankai University, Tianjin, 300071, P.R.China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

948-951

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)