会议专题

The application of Six Sigma methods in Packing Line Y of Company A

Facing the phenomena of high downtime and high outage rate, unstable OEE level of the equipment and unable to achieve the best level on Packing Line Y of Company A we use six sigma analysis tools for finding the various downtime reasons on Packing Line Y and then find out the key influence factors to OEE level, and present some improvement.

Jun-yi SHU Liang LIU

Guanzhuang Campus, University of Science and Technology Beijing, Beijing, China College of Management and Economics, Tianjin University, Tianjin, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1071-1074

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)