会议专题

Case Study on Optimization Strategy of Utility of Coal Mine Crisis Reduction Capability

Using the empirical research methods, the optimization strategy of coal mine crisis reduction capability utility was discussed from the perspective of the coal mine employee utility. Five elements of coal mine crisis reduction capability were put forward which consist of environmental preparation, organizational preparation, personnel preparation, competitive preparation and learning preparation, as well as four elements of staff utility of coal mine which consist of enterprise and job satisfaction, communication satisfaction, benefit satisfaction and promotion satisfaction. The questionnaire was designed based on the Likert six-point scale. JCMG was chosen as sample, then statistical method, reliability analysis and Structural Equation Method were used to analysis the data. The conclusion of the optimization strategy of the coal mine crisis reduction capability based on the utility was obtained: first, strengthening the coal mine crisis study; second, promoting the competitiveness of the coal mine; third, concerning employees’ enterprise and job satisfaction to influence the environment preparation element; forth, special concerning the coal mine employees’ promotion satisfaction to prevent the negative influence.

Tie-zhong LIU Wei LI

Scholl of Management and Economics, Beijing Institute of Technology, Beijing, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1221-1227

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)