Research on Profit Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project

It is the key of possessing stable subcontractors and establishing a long-term cooperative partnership that to design sound profit incentive mechanisms and to win-win with subcontractors for general contractor. In the incentive contract of owner, based on the incentive theory and principal-agency model , profit distributing models of general and subcontractors in one-off and long-term cooperation are set up. The results show that the greater the contributions and the lower the effort costs are, the greater the distribution coefficient is; Pareto equilibrium effort level can’t be paid in one-off cooperation, so long-term cooperation should be established between general contractor and subcontractors. A higher distribution coefficient should be given to subcontractor in long-term cooperation than in one-off, the more the cooperation times are,the higher the distribution coefficient is. The conclusions can provide thoughts and scientific basis for the design of the subcontract.

Hong-lian YIN Zhi-yi ChEN Yong-zhen YANG Yu-zhuo SUN Jian WU

Shandong Water Polytechnic, Rizhao, Shandong, P.R.China,276826

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1493-1497

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)