Stability Analysis of Supply Chain Collaboration for Project

In order to ensure supply chain collaboration stability, ant colony optimization algorithm was used to study construction supply chain operational efficiency, to determine the dynamic operational errors of construction supply chain. Neural network and data mining technology were used to forecast the investment risk of construction project, to determine the forecasting errors of construction project investment risk. Rough sets and neural network technology were used to evaluate the risk of discrete nondeterministic characteristics in construction process, to determine the risk evaluation errors of construction process for project. Fuzzy neural network with chaotic time series was used to forecast the construction demand of project in a certain period of time, to determine the errors of demand forecast in construction supply chain. Bessel function was used to analyze the stability of construction supply chain collaboration under internal load and external load. Abovementioned errors is overlapped, and input to Bessel function. System control theory is used to analyze stability state of construction supply chain under the impact load, to determine the method of construction supply chain span.

Ming-juan LI Guo-shuang TIAN

College of Economics and Management, Northeast Forestry University, Harbin, CHINA Corresponding Author, College of Economics and Management, Northeast Forestry University, Harbin, CH

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1523-1529

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)