会议专题

Application of Grey Prediction Models in Final Assembly Duration of Civil Aircraft

As a basis for rational organized production, yearly production program and production planning are made respectively according to assembly cycle, which is a significant link of the whole process and has a great impact on the performance, lifespan and cost of production itself. Aiming at the complicated process of airplane assembly and less sample data, combining with the characteristics of Grey System Theory, this paper chooses the GM (1, N) to obtain a precise model by estimating the aircraft assembly duration.

Wei-dong GUO Fa-jie WEI

Department of Management Science & Engineering, Beihang University, Beijing, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1648-1650

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)