Construction Project Bid Evaluation Optimization Model Based on the Method of ELECTRE- I

How to take reasonable and scientific decision-making method to select the better limited bidding schemes is a main question in the project bidding evaluation. This article introduces the ELECTRE-I method, on the basis of building indicator matrix, determine higher-level relations between different bid schemes, through accordance and disaccord examine, and seek for the non-inferior scheme subset unceasingly, finally, determine the best bid scheme. This method considered the actual situation and the value preference of construction units and overcame the supplementary situation between evaluative indicators, and it will provide a new method basis for the decision-makers.

Yun-na WU Yong HUANG Wen-gang CHEN

School of Economics and Management, North China Electric Power University, Beijing, China Shandong Electric Power Engineering Consulting Institute, State Nuclear Power Technology Corporation

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1660-1663

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)