会议专题

Research on Construction Project Process Performance Measurement

Generally, Performance Assessment (PA) of Construction Subject (CS) is based on Post-Evaluation. For one-time construction process, PA has limited ability to evaluate the process objectively. The Basic Model of the evaluation upon Process Performance (PP) in Construction Project (CP) was setup in this paper by AHP based on the Fuzzy Evaluation Method, and also by the study of comparison between the Process Performance (PP) concept definition in the construction project and its evaluation, In the mean time, the Model provides the specific guide-lines for evaluation during Construction Project (CP) Performance Assessment (PA) management process.

Jun-feng BAI Xue-ying YANG Li-hua TAO

Changchun University of Technology, Changchun, China

国际会议

2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management(2011 IEEE 第十八届工业工程与工程管理国际会议 IEEM2011)

长春

英文

1915-1918

2011-09-03(万方平台首次上网日期,不代表论文的发表时间)