Research on Construction Project Process Performance Measurement
Generally, Performance Assessment (PA) of Construction Subject (CS) is based on Post-Evaluation. For one-time construction process, PA has limited ability to evaluate the process objectively. The Basic Model of the evaluation upon Process Performance (PP) in Construction Project (CP) was setup in this paper by AHP based on the Fuzzy Evaluation Method, and also by the study of comparison between the Process Performance (PP) concept definition in the construction project and its evaluation, In the mean time, the Model provides the specific guide-lines for evaluation during Construction Project (CP) Performance Assessment (PA) management process.
Jun-feng BAI Xue-ying YANG Li-hua TAO
Changchun University of Technology, Changchun, China
国际会议
长春
英文
1915-1918
2011-09-03(万方平台首次上网日期,不代表论文的发表时间)