Duration Estimation Method for Highway Construction Work
How to estimating the duration of construction work is a key factor to consider when scheduling a new highway project. Because highway construction projects are generally completed outdoors, this work is inevitably affected by kinds of random factors. There is the high level of uncertainty involved in highway construction. Current project planning based on traditional duration estimation method cannot clearly ascertain the level of uncertainty. This paper divides the random factors involved in highway construction into two groups: weather conditions and the other factors. According to the different characteristics of these two groups of the random factors, the paper proposes different methods to deal with them when estimating the work duration. The computer simulation technique is used to estimate the effect of weather conditions. The traditional PERT method is used to estimate the effect of the other random factors. Finally, a case study is conducted that confirms the method can be practically used to estimate more reliable durations of highway construction work.
LIU Weijun
School of Traffic and Transportation Engineering,Changsha University of Science & Technology Changsha Hunan 410114, China
国际会议
International Conference on Management and Service Science(2011年第五届管理与服务科学国际会议 MASS 2011)
武汉
英文
1-3
2011-08-12(万方平台首次上网日期,不代表论文的发表时间)