High Intensity Concrete Construction Technology and Management Mode of Large-scale Hydropower Project

The Three Gorges Project (TGP) is the largest concrete construction in the present world. The project, with a total amount of approximately 28 million m3 of concrete, is characterized by complicated structures, intensive construction and high technical standards, which should meet the requirements not only of stability but also of special flood releasing, power generation and navigation improvement. Through engineering practice, a management mode that embodies the characteristics of TGP construction has been formed. Various new techniques and technologies have been used to ensure the concrete quality. Design, construction and management measures were adopted for the concrete works of the project. It is shown that, a scientific and reasonable management mode is crucial for planning, controlling and coordinating a large-scale construction project, which is the key to the success of hydropower development.

Dai Huichao Mao Jingqiao Cao Guangjing

College of Water Conservancy and Hydropower Engineering Hohai University Nanjing, China China Three Gorges Corporation Yichang, China

国际会议

International Conference on Management and Service Science(2011年第五届管理与服务科学国际会议 MASS 2011)

武汉

英文

1-4

2011-08-12(万方平台首次上网日期,不代表论文的发表时间)