Consideration for Shield TBM and NATM Method of Design VE in Korea-China-Japan Sea Botton Tunnel

VE design is advanced Construction Management Techniques. It is affect to seek the optimal costeffective for Value Engineering review conducted as creative alternatives derived by other peoples and CVS finalist That is conducted Quality, contractor, cost etc by value engineering review. Therefore, Construction plan must compare rock excavation about shield TBM method and NATM method though the introduction of Value Engineering. It is must be improved quality, optimal cost of construction and the quality of the performance. In this study, Explosives manufacturing technology and national guidelines are written about blasting method. It is important in NATM method. NATM method that is important in blasting method and shield TBM that is important in Mechanical excavation techniques are compared in Function definition and FAST Diagram etc. Review result, NATM method was excellent more than Shield TBM method in Korea-China-Japan Sea Botton Tunnel.

Myung-seog Ahn Sung-jin Kim

Dongseo University, Busan, Republic of Korea

国际会议

The 3rd Asian-Pacific Symposium on Engineering Blasting and the International Conference on Physical Problems of Rock Destruction(第三届亚太地区爆破技术研讨会暨第七届岩石破碎物理问题国际会议)

厦门

英文

203-208

2011-08-10(万方平台首次上网日期,不代表论文的发表时间)