Study on Blasting Effect with Pre-Assessment Borehole Status by Inserting Real-time Bore Hole Endoscope Verification

By inserting a Borehole Endoscope beforehand charging explosives, could be sought overall status of boreholes and found weak points such as fractures or direction of joints. So it is possible to reflect weak points on some blasting work. In this study, using borehole endoscope to find typical weak points of boreholes first and considered each borehole condition to reflect blasting design. Each faulty zone, located in the interval of charge where in a mine, was replaced air deck charge method by self support Air-Tubes. Reduction of charge with overall improvement of blast effects and economic benefit occurred. Thus this study has shown new possibilities throughout small-scale blasting to large-scale in limestone mine.

D.W.Kang W.H.Hur

Dep.Of Energy & Mineral Eng.Dong-A Univ., Busan, Korea

国际会议

The 3rd Asian-Pacific Symposium on Engineering Blasting and the International Conference on Physical Problems of Rock Destruction(第三届亚太地区爆破技术研讨会暨第七届岩石破碎物理问题国际会议)

厦门

英文

392-397

2011-08-10(万方平台首次上网日期,不代表论文的发表时间)