The Method and Implementation of Icing and De-icing at Xuefeng Mountain Natural Icing Station
This paper introduces the basic situations of the natural icing station on Xufeng Mountain built by the state key laboratory of power transmission equipment & system security and new technology of Chongqing University, and explains the implementation methods of icing/de-icing at this station in a detail way. It is proved that this icing/de-icing method is feasible after over 3 years operation. The icing type and shape under natural environment is related to ambient parameters, conductor types, and distance between conductors and ground; the ice melting time under natural environment is determined by de-icing current, conductor types and environment factors. The research achievements can provide the power system with technology supply for keeping from icing disasters and lowering loss.
Zhang Zhijin Jiang Xingliang Huang Haizhou Hu Jianlin Sun Caixin
State Key Laboratory of Power Transmission Equipment & System Security and New Technology College of Electrical Engineering, Chongqing University Chongqing, China
国际会议
The 14th International Workshop on Atmospheric Icing of Structures(第十四届结构物大气覆冰国际研讨会 IWAIS 2011)
重庆
英文
52
2011-05-08(万方平台首次上网日期,不代表论文的发表时间)