On control regulation of urban initial period rainwater pollution
The initial period rainwater has a great influence on the quality of surface water in Tianjin city. To reducing the initial period rainwater pollution, the effective control measures must be taken for initial period rainwater. A comprehensive operation regulation by using the surplus capacity of sewage treatment plant, reservoirs and rivers is proposed and studied in this paper. The order of initial period rainwater storage is firstly in sewage treatment plant, then in reservoirs and finally drainage to rivers. By carefully arranging the intercepted amount of every storage stage, the pollution of initial period rainfall in an example Tianjin area is shown to be effectively solved.
Xue-Yi You Jing Li Yan-Wei Li Min Ji Xiu-Duo Wang Le-Jun Zhao Liu-Ming Pan
School of Environmental Science and Engineering, Tianjin University, Tianjin 300072,China School of Environmental Science and Engineering, Tianjin University,Tianjin 300072,China Tianjin Municipal Engineering Design & Research Institute, Tianjin 300051,China Tianjin Municipal Engineering Design & Research Institute, Tianjin 300051, China
国际会议
哈尔滨
英文
705-709
2011-03-26(万方平台首次上网日期,不代表论文的发表时间)