会议专题

Casting Process Optimization for Large Bearing Bush of Zinc-Base Alloy

The numerical simulation of temperature field in the solidification process for large bushing castings of zinc-base alloy was made with HUAZHU CAE/Inte-CAST10.0 software, the tendency and the position of shrinkage were predicted; It is discussed in this paper how velocity of flow of cooling water and cooling time affect the solidification liquid, temperature gradient and shrinkage;0based on this the causes of shrinkage defects is analysised during actual casting process; and the design of these castings was optimized by analyzing the simulation result. The results show that: the hot spot of casting was cooled in bottom and inner surface two directions by means of seting chilled iron at bottom of bearing bush and using water-cooling metal core in inner cavity of casting simultaneously, that can eliminated shrinkage hole and porosity.

GaoCun-Zhen Yang Di-xin Xie Jing-pei Wang Ai-qin Wang Wen-yan

College of Materials Science and Engineering, Henan University of Science and Technology, Luoyang 471003,China;Henan Key Laboratory of Advanced Non-ferrous Metals, Luoyang 471003,China

国际会议

The 6th International Conference on Physical and Numerical Simulation of Materials Processing(第六届材料与热加工物理模拟及数值模拟国际学术会议 ICPNS 2010)

桂林

英文

1-5

2010-11-16(万方平台首次上网日期,不代表论文的发表时间)