会议专题

Simulation of Flow Field in Pre-dams and Phosphorus Elimination during Rainstorm

Numerical simulation was established and validated by the course of the rainstorm following 25 hours, which shows that the flow field can help to make the water in pre-dam effuse and prevent the Dianchi Lake water from recharging. Soluble reactive phosphorus (SRP) elimination was calculated along the whole rainfall. The result shows that the simulation is identical to the calculated and is able to account for SRP removal. SRP removal efficiency is over percent forty eight in despite of rainstorm and so the pre-dam technique may be a rewarding choice for non point pollution control, especially for hypereutrophic lakes and reservoirs.

LI Bin LU Xiwu NING Ping LI Bin

Department of Environmental Engineering Southeast University Nanjing, China Faculty of Environmental Kunming University of Science and Technology Kunming, China

国际会议

The 4th International Conference on Bioinformatics and Biomedical Engineering(第四届IEEE生物信息与生物医学工程国际会议 iCBBE 2010)

成都

英文

1-4

2010-06-18(万方平台首次上网日期,不代表论文的发表时间)