ROOT CAUSE ANALYSIS OF THE POWER GENERATION CAPABILITY DECREASE AFTER THE 5TH REFUELLING OUTAGE OF LING AO 2
The power generation capability of Unit 2 of Ling Ao Nuclear Power Plant has been decreased about 6MW after its fifth refueling outage in 2008. This paper investigates the activities which may influence the unit capability in the outage, compares the related parameters before and after the outage, and then analyzes its root causes. From the root cause analysis, it can be found that the replacement of orifices which measure the feedwater flow was the main reason for the capability decrease. Finally, some modification measurements have been provided to recover the unit capability.
Chi Zhiyuan Chai Weidong Zhang Dayong Dong Kang Wang Guoyun Wang Chun
Daya Bay Nuclear Power Operations & Management Co.Ltd (DNMC)Shenzhen, Guangdong, China Daya Bay Nuclear Power Operations & Management Co.Ltd (DNMC) Shenzhen, Guangdong, China
国际会议
18th International Conference on Nuclear Engineering(第18届国际核能工程大会 ICONE 18)
西安
英文
1-3
2010-05-17(万方平台首次上网日期,不代表论文的发表时间)