OPTIMIZATION OF PRODUCTION PLAN AND RISK CONTROL IN QINSHAN III NPP
Optimized and improved measures have been implemented in Qinshan III NPP to optimize the management of routine production plan, strengthen maintenance work risk analysis, and improve the plan execution capability, which involve unified management of generation, refuelling, periodic test and maintenance plans, simplifying the defect scales and reducing interlinks of defect disposal, intensifying the assessment on plan execution and adopting performance evaluation and star rating measures.
Jun Zhou
Third Qinshan Nuclear Power Co.,Ltd.Haiyan, Zhejiang, P.R.China 314300
国际会议
18th International Conference on Nuclear Engineering(第18届国际核能工程大会 ICONE 18)
西安
英文
1-5
2010-05-17(万方平台首次上网日期,不代表论文的发表时间)