THE ADVANCED INSTALLATION METHOD OF CONTAINMENT LINER PLATES
In Korea, newly advanced installation method of containment liner plates was developed and adopted for the construction of Shin Wolsong Unit 2 NPP. The key method of the new installation method of concrete liner plates was using a three-stage-based modularization (lifting of 3 plate ring module) instead of using conventional installation method. In this paper, overall newly developed installation method of containment liner plates including such as characteristics, merits and procedures were described briefly.
Woosung Kim Jihong Park
Korea Institute of Materials Science, 531, Changwondaero, Changwon Gyeongnam, Korea
国际会议
18th International Conference on Nuclear Engineering(第18届国际核能工程大会 ICONE 18)
西安
英文
1-5
2010-05-17(万方平台首次上网日期,不代表论文的发表时间)