CURRENT STATUS OF CONCEPTUAL DESIGN STUDY TOWARD THE DEMONSTRATION REACTOR OF JSFR
JAEA is now conducting “Fast Reactor Cycle Technology Development (FaCT) project for commercialization before 2050s. A demonstration reactor for Japan Sodium-cooled Fast Reactor (JSFR) is planned to start operation around 2025. In the FaCT project, conceptual design study on the demonstration reactor has been performed since FY2007 to determine referential reactor specifications for the next stage of design work of licensing and construction study. Plant performance as a demonstration reactor for the 1.5 GWe commercial reactor JSFR is being compared between 750 MWe and 500 MWe plant designs. In this paper, the current status of the conceptual design study for the demonstration reactor plant is summarized.
Takaaki Sakai Shoji Kotake Kazumi Aoto Takaya Ito Yoshio Kamishima Jun Ohshima
Japan Atomic Energy Agency Oarai, Ibaraki, JAPAN Mitsubishi FBR Systems, Inc.(MFBR),Tokyo, Japan
国际会议
18th International Conference on Nuclear Engineering(第18届国际核能工程大会 ICONE 18)
西安
英文
1-8
2010-05-17(万方平台首次上网日期,不代表论文的发表时间)