会议专题

Determination and Cost allocation of reserve in deregulated environment

In this paper,a new approach is introduced for reserve cost allocation in a disaggregated pool market model.The reliability level adjusted by ISO and the reserve is provided such that this reliability level satisfied.Opposite of the most paper that published in this field,in this method the generators will pay the reserve cost and so it could be an strong incentive for them to improve their reliability level.The proposed method is applied to the RBTS to examine the effectiveness of the proposed method.

Reserve determination:Reliability:Power market:Cost allocation

M. M. Barati K. Afshar N. Bigdeli

EE Department,Imam Khomeini International University Qazvin- Iran

国际会议

2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies(第四届电力设施管制、重建及能源技术国际会议 DRPT 2011)

威海

英文

1201-1204

2011-07-06(万方平台首次上网日期,不代表论文的发表时间)