Determination and Cost allocation of reserve in deregulated environment
In this paper,a new approach is introduced for reserve cost allocation in a disaggregated pool market model.The reliability level adjusted by ISO and the reserve is provided such that this reliability level satisfied.Opposite of the most paper that published in this field,in this method the generators will pay the reserve cost and so it could be an strong incentive for them to improve their reliability level.The proposed method is applied to the RBTS to examine the effectiveness of the proposed method.
Reserve determination:Reliability:Power market:Cost allocation
M. M. Barati K. Afshar N. Bigdeli
EE Department,Imam Khomeini International University Qazvin- Iran
国际会议
威海
英文
1201-1204
2011-07-06(万方平台首次上网日期,不代表论文的发表时间)