会议专题

Network Development Plan in Reconstructed Philippines Electric Power Industry

For the restructured electric power industry,transmission planning had become increasingly complicated with both economic and engineering considerations,and many new issues have surfaced.Significant challenges arising from the reconstruction for transmission planner are extensively analyzed from the views of transmission,generation,uncertainties,regulatory risks,and market needs,etc in this paper.Then,a specific long term transmission development plan for restructured electric power industry in Philippines is introduced.Long term transmission development plan of Philippines covers 2010 to 2030.For Luzon Grid,the long term transmission plan mainly focuses on the 500 kV and major 230kV transmission backbone,which is the major highway for bulk power transmission and the Metro Manila transmission configuration that serves the grids load center.For Visayas grid,the plan mainly focuses on the 230kV transmission backbone from Samar,Leyte,Cebu,Negro,and Panay Island,which is almost 900 km.For Mindanao grid,it focuses on upgrading transmission backbone from north part to the south part from 138kV to 230kV and on improving its transmission capacity.

electricity market:risk management:transmission planning:optimization

Mingjun Yuan Hua Ye Yutian Liu

School of Electrical Engineering,Shandong University,Jinan,China;State Grid Corporation of China,Bei School of Electrical Engineering,Shandong University,Jinan,China

国际会议

2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies(第四届电力设施管制、重建及能源技术国际会议 DRPT 2011)

威海

英文

1464-1469

2011-07-06(万方平台首次上网日期,不代表论文的发表时间)