Very Fast Transient Overvoltages and Protections in 500kV GIS
Very Fast Transient Overvoltage (VFTO) generated by the opening or closing of disconnections (DS) in GIS can range from several kHz to hundreds of MHz.In this paper,the technique of GIS is reviewed,the mechanism of VFTO is introduced; Estimation of Very Fast Transient Overvoltage has been carried out using EMTP for various switching conditions in a 500kV gas insulated substation.This over-voltage amplitude is generally under 2.0 p.u,but its rate of equivalent level is high,the tip is very steep.Influencing factors of VFTO are discussed.Necessary measures should be taken to protect the device in GIS.To avoid the harm of VFTO in GIS,operators should minimize the operation of DS as much as possible.
Electromagnetic transient analysis:GIS :VFTO
Peng-fei Hu He-mei-zi Tang Qing-quan Li Wei Wang
High Voltage Institute School of Electrical Engineering,Shandong University Jinan,China Shandong EHV Power Transmission Company Shandong Electric Corporation Jinan,China
国际会议
威海
英文
1865-1868
2011-07-06(万方平台首次上网日期,不代表论文的发表时间)