Multi-level Fuzzy Synthesis Evaluation on Construction Supply Chain Risk
Due to the fuzziness of construction supply chain risk, a two-level fuzzy synthesis evaluation model, based on the object of construction supply chain of raw materials in cascade hydropower plants along Yalong River, has been developed using related fuzzy mathematics theories in this paper. Furthermore, the application of entropy method in determining the weight minimizes artificial errors, leading to a fairer way to compute the weight. Finally such a model is employed in real applications to demonstrate its feasibility in the evaluation of construction supply chain risk.
construction supply chain risk fuzzy synthesis evaluation entropy method
Wenzhen Xiao Zhenyuan Liu Weihua Zhong
Control Science and Engineering Department, Huazhong University of Science and Technology, Wuhan Chi Control Science and Engineering Department , Huazhong University of Science and Technology, Wuhan Ch Ertan Hydropower Development Company. Chengdu China
国际会议
2011 China Control and Decision Conference(2011中国控制与决策会议 CCDC)
四川绵阳
英文
266-269
2011-05-23(万方平台首次上网日期,不代表论文的发表时间)