A Two-stage Heuristic Method for Vulcanization Production Scheduling
There are more product specifications, great production and much equipment over the whole process of rubber tire vulcanization. Aiming at rubber tire vulcanization production scheduling single-process, parallel machines scheduling problem with special process constraint, a two-stage scheduling strategy of vulcanization production, the load distribution of equipment and operation plans sequencing, is proposed. Equipment load distribution model of vulcanization machine based on 0-1 integer programming is built and improved maximum elimination algorithm is proposed. Operative plan sorting model based on 0-1 integer programming is built and an optimal algorithm based on minimum delay time is proposed. The algorithm was tested by online data. Results show that the two-stage scheduling method can quickly workout the optimal scheduling planning of vulcanization, reduce the production cost, and improve productivity. The method will lay the firm groundwork for application to production process in the future.
Vulcanization Scheduling Load distribution Maximum elimination algorithm
Shengping Yu Diancai Yang Xiuying Wang Kehui Zhu Binglin Zheng
Key Laboratory of Integrated Automation of Process Industry (Northeastern University),Ministry of Ed Mesnac Co.,Ltd,National Tire Technology,Qingdao,China
国际会议
2011 China Control and Decision Conference(2011中国控制与决策会议 CCDC)
四川绵阳
英文
3609-3613
2011-05-23(万方平台首次上网日期,不代表论文的发表时间)