Integration of large scale wind farm into electrical grids

In Europe,China and around the world many large wind farms have been installed and more have been planned. The wind farm installations must meet the Grid Code requirements for connections. Many difficulties have been encountered in meeting these requirements,especially for fault ride through,active power and frequency control,reactive power and voltage control requirements. This paper reviews the associated challenges for integration of large scale wind power into grids and investigates the development of Grid Codes from different countries. For existing problems the paper describes some solutions for connection of large scale wind power with power gird. These solutions include establishing accuracy wind power forecasting through advanced wind energy management system,making feasible connection comparison and selection and developing energy storage technologies to provide adequate margin to achieve the power balance and mitigate the impact of wind power intermittence

Large wind farm DFIG FACTS HVDC Grid Code Energy Storage

Meiqi Yao Liangzhong Yao

Alstom Grid China Technology Centre,Shanghai,China Alstom Grid Research & Technology Centre,Stafford,UK

国际会议

2010年中国国际供电会议(CICED 2010)

南京

英文

622-626

2010-09-13(万方平台首次上网日期,不代表论文的发表时间)